Circor instrument fittings

5 March 2004


Statoil, the platform owners, determined that the whole project should have a minimum life span of 25 years. The solution included a complete system, which was fully assembled and ready to use. All pipe work was fully welded to ASME IX and was in 5cm stainless steel with instrument fittings and valves supplied by Circor Instrumentation.

The system comprised two 500l air receivers designed to ASME, U stamped and hot dipped galvanised to provide the required corrosion resistance, and a stainless steel electric control panel.

The compressor has a 30bar outlet pressure and 16.5m3/hr delivery to fill each receiver in less than an hour.

For further information, email: aratna@circor.co.uk or see the weblink below.




External weblinks


Circor Instrumentation



Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.