Flood management contract awarded in Poland

7 December 2009


The polder will cover an area of 2630ha with a retention volume of about 185Mm³ in a flood event. The dike will have a length of 21.8km and be built as an earthfill dam with an embankment volume of about 7.4Mm³. Hydraulic structures such as gates, spillways, etc will be constructed in order to regulate the filling and emptying of the polder during a flood event.

A disastrous flood in 1997 on the River Odra in Poland killed 54 people and caused extensive damage to infrastructure. As a result a comprehensive program was developed, funded by the World Bank, to enhance flood protection and to protect more than 2.5 million people against flooding.




Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.