Low water levels at Kariba intensify Zambian power crisis

13 November 2015


Zambia's power deficit is expected to widen by 42% next month as low water levels at Kariba dam affect hydropower production, according to reports by Bloomberg. The shortfall will increase to 1000MW from the current 700MW.

The Zambezi River Authority stated that the reservoir was 21% full as of the end of last week. This compares with 60% full for the same period last year.

Kariba Lake was created and designed to operate between levels 475.50m and 488.50m with 0.70m freeboard at all times. Lake levels have continued to drop and were at 478.51m on 7 November 2015; 5.15m lower than the level recorded last year on the same date.



Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.