Selection of optimum capacity for run-of-river power plant

9 March 2004


A methodology for finding optimum capacity for small hydro power projects (SHP) on the basis of benefit/cost analysis incorporating uncertainty in stream flow is presented in this paper. A probabilistic hydrological model is used to account for the uncertainties in hydrological data relating to independent or dependent events. The use of this method will give the optimum installed capacity for SHP, hence will reduce risks associated with it and will provide optimum benefits throughout the operational period of the power project.

Want to read the full paper?

To purchase a copy of this Dam Engineering paper, please email the Editor, Carrieann Davies, on: cdavies@wilmington.co.uk or fax: +44 (0) 20 8269 7804.
Please include your name, postal address, credit card number and issue number.
The cost is £20 sterling for each paper, postage & handling free.
Your order will be confirmed by email. We aim to dispatch your order within 48 hours of receipt.





Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.