Table 1

1 January 2000


Table 1: Assumptions employed in the guides on optimum diameter of diversion tunnel
Type Top width, B (m) Average length, W(m) Average side slope Freeboard, F (m)
Embankment 5 100 to 1200 1H:2.25V 1.5
Length, L (m) Diameter, D (m) Longitudinal slope, S (-) Lining thickness, T(cm)
100 to 1400 3 to 15 0.005 (0.001 to 0.015) 30 to 75, varying linearly with D
Discharge, Q (m3/s) Manning Roughness Coefficient, n Flow regime Exit
50 to 1900 0.014 for RC lining 0.022 for shotcrete 0.030 for natural rock Pressurised (full flow) Unsubmerged
Type I (n=0.014 Type II (n=0.022) Type III (n=0.030) Rock bolts Shotcrete
Rock bolts + Shotcrete + Reinforced concrete (RC) Rock bolts + shotcrete Little rock bolts + little shotcrete ~3m long 10cm thick with steel wires
Tunnel excavation, C1 (US$/m3) Concrete lining C2 (US$/m3) Support (rock bolts + shotcrete), C3 (US$/m2) Fill for the cofferdam, C4 (US$/m3)
8 to 48 40 to 140 24 to 70 2 to 8



Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.