USBR awards Ridges Basin contract

5 December 2006


When completed, the inlet conduit, a core feature of the Animas-La Plata hydro project, will carry Animas river water from the Durango pumping plant to lake Nighthorse.

The primary features to be constructed under the inlet conduit contract award include construction of a 72-inch (183cm) buried steel pipeline that will convey project water 3.4km from the pumping plant to the reservoir, as well as construction of the vents and stilling structures that will regulate the flow of the water being pumped from the Animas River to the reservoir.

The inlet conduit will be buried in a trench at a normal depth of around 2m below the ground and backfilled so that upon completion of the construction, the terrain can be re-vegetated. When completed, the conduit will terminate on the reservoir side of the ridge with a stilling structure from which the flow will continue to the reservoir.

The route of the conduit from the pumping plant to the reservoir will travel southerly from the pumping plant, turn southwest to cross CR 211 and Bodo Draw before turning to the west to continue to lake Nighthorse.

USBR anticipates that work on this inlet conduit contract to be completed in 2009, with Commissioner Robert W. Johnson saying that construction of the Animas-La Plata project now stands at approximately 44% complete.




Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.