You searched for edf


Current Refinements
edf
Content Type News
Date 2022
Remove all refinements
Refine Search

IHA CEO says COP27 hasn't gone far enough
01 December, 2022
Following the conclusion of COP27, CEO of the International Hydropower Association Eddie Rich issued a statement in which he said he was ‘disappointed with the outcome’.

Pumped storage project set to benefit from a share of UK government funding
29 November, 2022
A pumped storage project is one of five energy storage projects across the UK that is set to benefit from a share of over £32 million government funding in the second phase of the Longer Duration Energy Storage (LODES) competition.

Agreements signed for Mpatamanga hydropower plant development
07 September, 2022
A consortium composed of EDF and Scatec, with its venture partners British International Investment (BII) and Norfund, has officially been named project lead developer of the Mpatamanga hydropower project in Malawi, with a binding commercial agreement signed yesterday with the Government of Malawi (GOM) and the International Finance Corporation (IFC)

Voltalia to build small hydropower plant in French Guiana
01 September, 2022
Voltalia has announced that it is developing a 2.9MW run-of-river hydroelectric power station in the commune of Maripa-Soula in French Guiana.

France’s Grand Maison plant testing HSC technology
13 June, 2022
The Grand Maison hydropower plant in the French Alps – which is part of the European Union (EU)-funded XFLEX HYDRO initiative – is testing how Hydraulic Short Circuit (HSC) technology can enable the simultaneous use of very high head pumps and Pelton turbines, using smart digital controls.

BUMAX fasteners verified in pilot tidal project in France
22 March, 2022
Sweden-based BUMAX has announced that its premium stainless steel fastener solution has been verified by a pilot tidal power project in France, with the fasteners suffering no corrosion, wear or galling after two years of operation in extreme conditions.

Minister updates progress at Cameroon’s Nachtigal project
04 January, 2022
Civil engineering works at the 420MW Nachtigal project are over halfway complete, Cameroon’s Minister of Water and Energy, Gaston Eloundou Essomba, updated during a recent site visit.



Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.