Breakdown of the scheme’s overall costs
Item Cost % of total
Consultancy costs    
(Includes: feasibility study, topographic and river surveys, ground investigations, consultations, environmental assessment, reporting, design, etc) £599,000 (US$943,063) 10.8%
     
Environmental agency costs £414,000 7.5%
(Includes: client costs, environmental inputs, ECC Project Manager, landowner compensation) (US$651,792)  
   
     
Site supervision    
(Includes: ECC Supervisor and staff) £329,000 (US$517,970) 5.9%
     
     
Construction    
(Includes: out-turn, including £4.2M (US$6.6M) 75.8%
compensation events) £5.5M (US$8.7M) 100.0%