Under the terms of the contract, Cavico will excavate and construct a total of 11,500ft of 10.5ft-wide tunnels and a 131ft-high surge tank that will measure 30.2ft in diameter. Revenue will be recognized in stages as Cavico completes each phase of the project.
The twin-unit hydro plant will have a 24MW annual capacity once it becomes operational. Song Giang Hydropower Joint Stock Company expects to invest a total of $23.2M in the plant.