• Establishment and operation of a construction camp.
• Construction of a weir on the Sigatoka River. The weir will consist of:
– Concrete gravity weir structure.
– Three radial spillway gates.
– Two low level sluice gates.
– A single residual flow control valve.
– Control building and appurtenant facilities.
• Nadarivatu Water Conveyance System.
This will consist of:
– an intake structure comprising screens, intake gate, stop logs and screen cleaner.
• Either:
– Conveyance option 1 “Tunnel-Tunnel” or
– Conveyance option 2 “Tunnel-Penstock”.
• Project wide roading (excluding transmission line road only) and maintenance of public roads throughout the project duration – and other works described in the bid documents and related project drawings.
CONTACT: www.evalua.com.au/fea