The mavel KB1050K3 turbine will have a runner diameter of 1050mm, with four runner blades, 16 wicket gates and will drive a horizontal asynchronous generator.
The Fergus Mill plant will be at the site of a former mill which is being rehabilitated as a condominium complex. The 270kW plant is expected to begin operation in late 2003.