The plant, which will be built on the Dac Pone river, will have two generating units of a total installed capacity of 14MW, generating 62.9MkWh of electricity each year.
It is scheduled to start operation in the second quarter of 2007.
The plant, which will be built on the Dac Pone river, will have two generating units of a total installed capacity of 14MW, generating 62.9MkWh of electricity each year.
It is scheduled to start operation in the second quarter of 2007.