However, gross margins were higher in 2004 as a result of higher production from cheaper nuclear and hydroelectric generating stations, lower fuel expenses and savings provided by cost reductions, streamlining and restructuring initiatives.
Serving the hydro power and dam construction industries since 1949
However, gross margins were higher in 2004 as a result of higher production from cheaper nuclear and hydroelectric generating stations, lower fuel expenses and savings provided by cost reductions, streamlining and restructuring initiatives.