The scheme is to be built near Schemerl weir and will consist of a 30m long, 12m wide and 7m high over-flow hollow body weir with attached pneumatically operated spillway gates. It will also feature twelve VA Tech Hydro Hydromatrix units and an operation building.

Work is to be carried out by VA Tech Hydro in consortium with its Austrian-based partners Porr Technobau and Verbundplan, the leader of the group, with commissioning of the plant expected in summer 2005.