Table 2: Potential small hydro sites in Tanzania
| Location |
Head in metres |
Average flow rate (m³/sec) |
Capacity (kW) |
| Kiwira river |
285 |
15.7 |
25,000 |
| Msadia/Mfwizi river |
120 |
18 |
25,000 |
| Nakatuta (Upper Ruvuma River) |
20 |
6 |
15,000 |
| Luegele river |
175 |
15 |
15,000 |
| Nakatuta (Ruvuma) |
30 |
61 |
9,000 |
| Mbulu (Arusha) |
450 |
1.75 |
8,100 |
| Mbaka river |
200-300 |
2.5 |
8,000 |
| Kibwaka river |
50 |
35 |
5,100 |
| Hagafiro river |
n/a |
n/a |
5,000 |
| Msofwe river |
500 |
0.95 |
4,500 |
| Lukima river |
120 |
4 |
4,000 |
| Kifunga Falls |
n/a |
16 |
3,600 |
| Hainu River (Arusha) |
100 |
0.48 |
3520 |
| Nzovwe (Rukwa) |
n/a |
0.33 |
3,000 |
| Lupa river |
50 |
15.7 |
2,800 |
| Wuku river |
80 |
3 |
2,500 |
| Yeye river |
90 |
2.5 |
2,500 |
| Mtozi river |
40 |
12 |
2,400 |
| Mtambo river |
40 |
8 |
2,400 |
| Kawa river |
200 |
2.7 |
2,000 |
| Njombe Falls |
n/a |
5.6 |
2,000 |
| Mbawa river |
200 |
1 |
1,800 |
| Kihurio (Seseni River, Kilimanjaro) |
n/a |
3.3 |
1,740 |
| Ndungu (Goma River, Kilimanjaro) |
n/a |
3.3 |
1,740 |
| Luwika river |
200 |
0.8 |
1,400 |
| Lilondo river |
150 |
0.75 |
1,400 |
| Malisa river |
75 |
6 |
1,250 |
| Mbede river |
50 |
0.3 |
1,240 |
| Luamfi river |
40 |
9 |
1,200 |
| Luiche river |
200 |
0.5 |
1,100 |
| Mba river |
300 |
0.55 |
1,000 |
| Uvinza (Ruchugi River) |
n/a |
30 |
1,000 |
| Songwe river |
20 |
10.6 |
1,000 |
| Ruchugi river |
20 |
30 |
1,000 |
| Himo I and II (Kilimanjaro) |
n/a |
3.3 |
945 |
| Lukwate river |
60 |
1.8 |
900 |
| Chulu river |
300 |
0.3 |
850 |
| Kaonjuba (Kagera River) |
90 |
1.2 |
800 |
| Mkuti river |
23 |
3.3 |
630 |
| Hanga river |
40 |
5.2 |
550 |
| Muse river |
200 |
0.2 |
520 |
| Pinying river |
n/a |
0.9 |
450 |
| Kasongenye (Kagera River) |
n/a |
1 |
420 |
| Filongo river |
150 |
0.3 |
415 |
| Kirambo river |
300 |
0.1 |
280 |
| Kilemba river |
300 |
0.95 |
270 |
| Luaita river |
30 |
0.6 |
190 |
| Mamba river |
50 |
0.1 |
155 |
| Yungu river |
20 |
0.5 |
90 |
| Rungwa river |
108 |
35 |
50 |
| Total |
|
|
~175 MW |
Source: Based on information from Tanesco
|