The penstock was originally installed during and after World War Two. By the end of 2003, the penstock, the tunnel lining and the manifold will be removed.
VA says that the new tunnel lining and manifold will meet the highest technological standards, both in terms of materials used and production methods.
The pipes produced on site will measure 3m in diameter.