A date with an old flume
-
11. Water flows in the repaired flume -
4. The original rockfill embankment with stone façade (left) -
1b: Transition between the in-ground canal and elevated flume before repair... -
2: The Flume before repair -
8a. Installing pre-cast concrete units continues, supported on the new... -
10a. The project nears completion -
1d: Transition between the in-ground canal and elevated flume before repair... -
8b. Installing pre-cast concrete units continues, supported on the new... -
9: Pre-cast units in place -
1c: Transition between the in-ground canal and elevated flume before repair... -
6e. Installing the reinforced soil embankment -
12b. The completed flume -
3: Work gets underway on the emptied flume. -
6c. Installing the reinforced soil embankment -
12a. The completed flume -
6b. Installing the reinforced soil embankment -
6a. Installing the reinforced soil embankment -
6f. Installing the reinforced soil embankment -
5. Old flume and embankment removed, with rockfill stockpiled on site -
1a: Transition between the in-ground canal and elevated flume before repair... -
6d. Installing the reinforced soil embankment -
7: Lowering a pre-cast concrete unit into place -
10b. The project nears completion