Consortium signs contract for Upper Yeywa consulting work

6 August 2013


A consortium of Lahmeyer International GmbH and Stucky SA has been awarded a contract to provide consulting services for Myanmar's Upper Yeywa Hydropower Project.

The contract was signed in early June between the Department of Hydropower Implementation, Ministry of Electric Power and the Consortium in the presence of his Excellency the Minister for Electric Power of the Government of the Republic of the Union of Myanmar, his Excellency the Deputy Minister U Myint Zaw and his Excellency the Deputy Minister U Aung Than Oo.

The Upper Yeywa Hydropower Project is located on the Myitnge River in the Kyaukme District of the Northern Shan State.

The project comprises a 90m high concrete gravity dam with a crest length of 243m, a gated spillway in the dam center with a discharge capacity of 8,900m3/sec, two power intakes, two headrace tunnels of 10m diameter each leading to an open-air powerhouse located on the left bank of the river with an installed capacity of 280MW.

The project is expected to start commercial operation in 2018.

The consulting services of the Lahmeyer International - Stucky Consortium comprise the review of existing studies and design, the preparation of construction drawings, site supervision and quality management.

Lahmeyer International was the consultant for the Kinda Dam multipurpose project in Myanmar, completed in 1983.



Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.