Forces Motrices de la Gougra SA (FMG) is progressing plans to raise the Moiry dam in Switzerland by nine metres, increasing storage capacity to shift part of its hydropower generation from summer to winter.
Technical studies for the construction project are under way. The next stage will involve preparing the documentation required for the approval procedures.
The project aims to increase electricity availability during the winter months, when demand is high, and strengthen Switzerland’s security of supply. It is one of the hydropower projects agreed in 2021 by representatives of the Swiss Confederation, cantons, energy sector and environmental organisations through the Hydropower Round Table. It is also among the 16 expansion projects included in the Federal Act on a Secure Electricity Supply from Renewable Energy Sources.
Environmental compensation measures have been explored through meetings and site visits with environmental organisations. Project planning also covers access routes, sustainable mobility and tourism, taking account of the needs of local businesses and visitors.
The dam is a tourist attraction in the Val d’Anniviers, and the proposed works will require changes to visitor infrastructure. At a municipal assembly on 16 November, the municipality of Anniviers presented residents with plans for access routes and tourism facilities, alongside an update on the dam-raising project.