Expected to be completed in early October, the modifications are related to the drain system in the spillway outlet structure, and will be similar to those performed on the structure in 2003.
The work will allow the continued safe operation of the dam, and are not expected to impact operation of the facility or access to Calamus reservoir.
Hydro Technology Showcase |
Have you considered on-line promotion of your products and services? The IWP&DC team is developing a Hydro Technology section on www.waterpowermagazine.com, which could include all the details about your latest product releases, together with photographs, technical details and live links to your site. |