A £2.4 million engineering research facility being built by the University of Edinburgh and commercial partner Babcock International at Rosyth in Fife, Scotland, will seek to speed the development of materials and structures for tidal energy, transport and other industries. The FASTBLADE facility will test new materials within full-scale structures such as tidal blades, plane components and bridge sections.
FASTBLADE will be the first facility in the world designed to carry out large-scale accelerated testing of tidal blades. Testing will use complex forces that simulate real environments, limiting the risks for product developers.
Engineering researchers will use an efficient hydraulic technology – developed by University spin-off company Artemis Intelligent Power – which enables structures to be tested significantly faster and using less energy compared with existing technologies. The system will recover energy between load cycles, reducing the cost of testing.
FASTBLADE’s first clients will include tidal stream developers. Tidal blades made of composite materials need to be designed to withstand high fatigue loads in harsh ocean conditions for up to 20 years.
Pioneering measurement systems will enable developers to learn from test datasets to understand damage accumulation and optimise blade structures through data-driven design.
FASTBLADE will help fulfil the University’s commitments as part of the Edinburgh and South East Scotland City Region Deal, which includes targets to help improve digital skills across the whole of the region.
The facility has received £1.4m from the Engineering and Physical Sciences Research Council and £1m from the University of Edinburgh. Babcock is the principal designer and host of the facility.
FASTBLADE is a key strand of a strategic partnership between Babcock and the University, developed with Edinburgh Innovations, the University’s commercialisation service.