Table 1

1 January 2000


Table 1: Operating Conditions
Normal High Water Level EL460m
Design flood water Level EL460.7m
Minimum Operating level EL424m
Maximum normal operating draw down rate (EL460m to EL 424m) 133 Days
Maximum draw down rate (Emergency) (EL 460m to EL 424m) 14 Days
Complete Emptying (Emergency) (EL424m to EL 385m) 15 Days
Design Wind Speed 160km/h
Earth quake -maximum horizontal bedrock acceleration 0.1g



Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.