Table 1

1 January 2000


Table 1 – Range of watertables¹1 Bogong Power Development Tunnel and Civil Works Contract, Volume 1, Formal Instrument of Agreement, Schedule 10B – Technical Particulars, AGL September 2006
Item Water levels (m AHD)
Headpond
Normal operating level (turbine rated output) 1067.2
Spillway crest level 1068
Maximum headpond level 1069
Tailwater
Minimum operating level (Lake Guy) 638.4
Minimum level at draft tube (controlled by a weir in the Bogong Power Station) 641.5
Mean operating level 645.5
Maximum normal operating level 649.68
Maximum flood level (Lake Guy) 653



Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.